Construction at Belmont Secondary Continues
Posted in News
Belmont Secondary School is now 50% clad. It is also weathertight with the exception of Block D. Current activities include installing millwork, flooring and finishing painting in Blocks A and B, while drywall is being completed in Block D. The school is scheduled to open September 2015.
- Atrium Level 3 - Looking East
- Atrium Roof Structure
- Atrium Walkways and Bridges
- Block A - East Elevation
- Block D - West Elevation with Covered Work Area
- Blocks A & B - South Wall Clad in Copper Penny
- Interior Learning Commons - Looking North
- Learning Commons & Main Entry - Exterior Elevation
- Learning Commons Ceiling & Catwalks
- North Sloped Truss Wall Clad
- Stair 2 - Exterior North Elevation